Customized Sheet Metal Stamping Parts of Construction

Product Details
Customization: Available
After-sales Service: Contact Customer Service
Warranty: None
Still deciding? Get samples of US$ 0.1/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (8)
  • Customized Sheet Metal Stamping Parts of Construction
  • Customized Sheet Metal Stamping Parts of Construction
  • Customized Sheet Metal Stamping Parts of Construction
  • Customized Sheet Metal Stamping Parts of Construction
  • Customized Sheet Metal Stamping Parts of Construction
  • Customized Sheet Metal Stamping Parts of Construction
Find Similar Products

Basic Info.

Model NO.
OEM
Processing Type
Shaping Metal
Material
Stainless Steel
Mould
Simple Single Process Dies
Surface Processing
Polishing
Fine Blanking
Double Acting
Process
Forming Process
Industry
Mold Accessories
Tolerances
0.01mm
Customized
Customized
Transport Package
Sea Freight
Specification
custom made
Trademark
wo bei de
Origin
Tianjing, China
Production Capacity
1000 Pieces

Packaging & Delivery

Package Size
20.00cm * 20.00cm * 2.00cm
Package Gross Weight
0.500kg

Product Description

Product Description

1. Raw Material  Copper, phosphor copper, Brass, Stainless steel, Aluminum, steel, spring steel, Nickel-Silver... and all different kinds of metal;
 
2. Surface treatment  Gold / Silver /Tin / Nickel / Zinc /  Chromium / Copper-plating /  Laser etching/Screen printing/Phosphating (can pass salt spray testing with 160 hours)/Black coating / Painting/ Power coating /Electrophoresis /  Passivating /Deburring /  Polishing /  Brush according to ROHS standard;
 
3. Quotation  Please provide the Formal drawings (normally, with DWG/STP/PDF file ), and make notes with material/QTY/surface treatment and any other requirements, we will provide you the quotation sheet within 48-72 hours;
 
4. Prototype & Mould We make the prototypes or molds according to the drawings confirmed by both of us and the customers! The lead time depends on the structure and qty of parts, Normally, the lead time for prototypes is 3-15 days; the lead time for mold is 10-25 days;
 
5. Production We will provide samples according to the drawings to customers for approval. Then arrange the production and confirm the delivery date according to the Purchase Order; Normally, the lead time for production is 5-30 days, the structure of parts is different, and the lead time will be different.
 
6. Package  Plastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Export carton and any other customized package according to the customers' requests.
 

Customized Sheet Metal Stamping Parts of ConstructionCustomized Sheet Metal Stamping Parts of ConstructionCustomized Sheet Metal Stamping Parts of ConstructionCustomized Sheet Metal Stamping Parts of ConstructionCustomized Sheet Metal Stamping Parts of ConstructionCustomized Sheet Metal Stamping Parts of ConstructionCustomized Sheet Metal Stamping Parts of ConstructionQ: How can I get an offer?
A: Please send us the drawings, quantity, weight and materials of the products.
Q: If we don't have drawings, can you draw them for me?
A: Yes, we can draw your samples and copy them.
Q: What kind of documents can you read?
A: Answer: PDF, IGS, DWG, step, etc...
Q: What is your packing method?
A: We usually pack the goods according to the customer's requirements. For reference: wrapping paper, carton, wooden case, pallet.
Q: When can I get the samples and your main orders?
A: For samples: 30-40 days after the start of mold making. For orders: 35-40 days, the exact time depends on the product.
Q: What are your terms of payment?
A: Order: 30% deposit, 70% payment before shipment.
Q: Where is your company located? Can we visit it?
A: We are in Tianjin, China. You are welcome to visit us at any time.





Please feel free to contact us and we will reply within 24 hours.
    

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier