Factory Custom High Quality CNC Metal Parts Sheet Metal Stamping Parts

US$0.20 100 Pieces (MOQ)
Port:
Tianjin, China
Production Capacity:
500000
Payment Terms:
L/C, T/T, D/P, Paypal
Rating: 5.0/5

Last Login Date:

Jun 30, 2025

Business Type:

Manufacturer/Factory

Main Products:

Metal Stamping Parts, Auto Parts, Motorcycle Parts, Sheet Metal Processing, Accessories, Sheet Metal Working

Find Similar Products

Product Description

Company Info

Basic Info.

Model NO.
st-n89
Type
Cold Stamping
Processing Type
Mould
Simple Single Process Dies
Surface Processing
Fine Blanking
Industry
Metal Stamping Parts
Tolerances
Customized
Customized
MOQ
10
Surface Treatment
Electroplating/Spraying/Polishing/Oxidation/Galvan
After-Sale Service
24 Hours
Delivery
Sea, Air, or Express
Quality
Excellent
After Warranty Service
Video Technical Support, Online Support
Transport Package
Polybag Lnner+Export Carton Outer
Specification
customized
Origin
Hebei

Product Description

1. Raw Material Copper, phosphor copper, Brass, Stainless steel, Aluminum, steel, spring steel, Nickel-Silver... and all different kinds of metal;
 
2. Surface treatment Gold / Silver /Tin / Nickel / Zinc /  Chromium / Copper-plating /  Laser etching/Screen printing/Phosphating (can pass salt spray testing with 160 hours)/Black coating / Painting/ Power coating /Electrophoresis /  Passivating /Deburring /  Polishing /  Brush according to ROHS standard;
 
3. Quotation Please provide the Formal drawings (normally, with DWG/STP/PDF file ), and make notes with material/QTY/surface treatment and any other requirements, we will provide you the quotation sheet within 48-72 hours;
 
4. Prototype & MouldWe make the prototypes or molds according to the drawings confirmed by both of us and the customers! The lead time depends on the structure and qty of parts, Normally, the lead time for prototypes is 3-15 days; the lead time for mold is 10-25 days;
 
5. ProductionWe will provide samples according to the drawings to customers for approval. Then arrange the production and confirm the delivery date according to the Purchase Order; Normally, the lead time for production is 5-30 days, the structure of parts is different, and the lead time will be different.
 
6. Package Plastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Export carton and any other customized package according to the customers' requests.
 

Q1: Where can I get product & price information?
A: Send us an inquiry e-mail, and we will contact you as we receive your mail.

Q2: How long can I get the sample?
A: Depending on your specific items, within 3 - 7 days is required generally.

Q3: What kinds of information do you need for a quote?
A: Kindly please provide the product drawing in PDF, and will be better if you can provide it in STEP or IGS

Q4: What are the payment terms?
A: 50% deposit, we take photos for your check and you then pay the balance.

Q6: Are you a trading company or factory?
A: We are a direct factory with experienced engineers and employees as well as an approximate 8,000 square meters workshop area.

Q7: What shall we do if we do not have drawings?
A: Please send your sample to our factory, then we can copy or provide you with better solutions. Please send us pictures or drafts with dimensions (Length, Height, Width), CAD or 3D files will be made for you if placed an order.

Q8: Can we get some samples before mass production?
A: Absolutely

Q9: Will my drawings be safe after sending them to you?
A: Yes, we will keep them well and not release them to a third party without your permission.

Q10: Is it possible to know how are my products going on without visiting your company?
A: We will provide detailed production plans and send weekly reports with pictures or videos to show the processing progress

Please feel free to contact us and we will reply within 24 hours.
    
 
Send your message to this supplier
Mr. Wangning

Post a Sourcing Request Now

People who liked this also liked
Get Quick Quotes